Reports 360/Manage reporting schedule | |
Duplicate an existing scheduled report |
Action available in the table of scheduled reports
- Duplicate a scheduled report
The duplication of a scheduled report is an interesting feature of the module "Manage reporting schedule".
The main advantage of duplication is to use an already existing mailing list to schedule a new, different report.
All the settings of the copied report will be applied to the duplicate. The name of this duplicated, scheduled report will have (1) to signal that it has a duplicate.
A duplicate (scheduled) report is inactive by default in the table showing the scheduled reports. You can edit the dissemination date of this report, as well as its scope, set up, and name. Any kind of modification will automatically put the duplicate in active status.
Like all the actions in the table, the duplicate function is accessible through the icon towards the end of the row where the reports are listed.
Comments
0 comments
Article is closed for comments.